Before construction could begin on the dam itself, loose rock had to be removed from the canyon walls. Special men were required for the job, men called "high-scalers." Their job was to climb down the canyon walls on ropes, where they worked with jackhammers and dynamite to strip away the loose rock.
Photo album created with Web Album Generator